Reasons to select BIOX® include:

With our refractory ore, gold is encapsulated in a sulfide matrix and additional processing is required to unlock the gold to allow its recovery by cyanidation. The process we have selected as being the most economic, environmentally sound, and simple to operate is the BIOX® bio-oxidation process, licensed to Golden Star by Biomin, a subsidiary of Goldfields Limited. At fully optimized production Bogoso/Prestea’s sulfide circuit operates at a design capacity of 3.5 million tonnes per year of refractory sulfide ore into the crusher, equivalent to 34 tonnes per hour of concentrate through the BIOX® circuit. Overall recovery is estimated at 80%, resulting in annual gold production from the sulfide plant of between 200,000 and 235,000 ounces.
The BIOX® process utilizes a combination of Acidithiobacillus ferro-oxidans, Acidithiobacillis thio-oxidans, and Leptospirillum ferro-oxidans. Among other places, these bacteria are found naturally occurring at the hot springs in Yellowstone National Park. They feed on sulfurous materials, and in doing so, liberate the gold particles from the sulfide mineralization. Optimization of temperature (35 to 45 degrees Celsius) and pH (1.2 to 2.0) are the most important factors in keeping the bacteria active and vital.
| Plant | Location | Year | Conc. Design Capacity (tpd) |
|---|---|---|---|
|
Fairview (GFL - BIOX®) |
South Africa |
1986 |
55 |
|
São Bento (GFL - BIOX®) |
Brazil |
1990 (closed) |
150 |
|
Harbour Lights (GFL - BIOX®) |
Australia |
1991 (closed) |
40 |
|
Wiluna (GFL - BIOX®) |
Australia |
1993 |
158 |
|
Ashanti (GFL - BIOX®) |
Ghana |
1994 |
960* |
|
Youanmi (Bactech) |
Australia |
1995 |
120 |
|
Coricancha (Tamboraque) (GFL - BIOX®) |
Peru |
Reopening 2007 |
60 |
|
Beaconsfield (Bactech) |
Australia |
1999 |
67 |
|
Fosterville (GFL - BIOX®) |
Australia |
2005 |
200 |
|
Suzdal (GFL - BIOX®) |
Kazakhstan |
2005 |
175 |
|
Bogoso/Prestea (GFL - BIOX®) |
Ghana |
2007 |
825 |
|
Jinfeng (GFL - BIOX®) |
China |
2007 |
790 |
| Kokpatas (GFL - BIOX®) | Uzbekistan | Mid-2008 est | - |
| * - running at 75% capacity or 720 tpd | |||